Menu Menu QUESTIONS?
  1. Insert a CellVent at a maximum of 24″ on center in open head joints with corrugated openings facing the exterior of the wall.
  2. Place CellVent directly on flashing membrane.
  3. Place CellVent in an open head joint at the flashing level.
  4. Installation only by experienced masons, waterproofers or general contractors in properly specified weep hole systems.
en_USEnglish